There are three ways to fix the cable awning: on the fascia board, with angle tensioners between the rafters, or with stainless steel tensioners between or under the rafters. The cable tension system is the same for all of them: first set and tension the cables, then hang the panel. This page shows every step, plus what is in the box, tools, slope and typical mistakes. The details come from our workshop and from the questions customers ask us about installing over a patio.

The Answer in Brief
Cable awning installed: fabric panel with sliders on two tensioned cables between the rafters

You can install the cable awning yourself. All the fixing parts are included, you just need a drill and a screwdriver. How this system differs from other awnings is explained in What are awnings. If you would rather sew the panels yourself, see Making a cable awning yourself.

  • Choose a variant: fascia board at front and back, then screw hooks and standard tensioners. No fascia board, then angle tensioners at the side of the rafters. Fixing under the rafters or a compact solution, then stainless steel tensioners.
  • Cables first, then the panel: set all the cables and tension them firmly, then hang the panel with its sliders.
  • Cut the cable correctly: turn the tensioner right out, clamp the cable on one side, line it up on the other side together with the cable clamp, and only then cut it.
  • Use every cable guide: 2 per panel under 145 cm wide, 3 from 145 cm, 4 from 300 cm.
  • The panel does not touch the rafters: the aluminium tube with its plastic caps is 10 mm shorter than the clear width.
  • On a slope, park the fabric stack at the highest point. A stopper on the first aluminium tube holds it there.
Before Installing

Which Fixing Suits Your Structure

Before you fix the cable awning, work out what the cables will hold on to. That decides which fixing kit you order and how you measure. How to take the measurements is explained in How do I measure a cable awning.

Fascia board at front and back

If your roof has a fascia board at the front and back, or a fascia board at the front and the house wall at the back, you screw in screw hooks and attach the cable with the standard tensioner. This is variant 1.

Between the rafters

If there is no fascia board, angle brackets (variant 2) or stainless steel tensioners (variant 3) sit at the side of the rafters. When retracted, the system is hardly visible, and lights in the rafters stay clear. You drill about 8 holes per bay. You can read more about holding power in a rafter under Fixing an awning to roof rafters.

Under the rafters

Stainless steel tensioners below the rafter level need only about 4 holes per bay, and one panel can cover several bays. The system then stays visible, and lights in the rafters are covered. With an aluminium frame that offers no hold between the rafters, this is the usual way. Measure from centre of rafter to centre of rafter here. If two panels are to hang from the same rafter, two tensioners of 28 mm width each need room side by side, which gets very tight on a 6 cm wide rafter.

Facade and insulated house wall

The cables on the house side can also be fixed to the face of the facade. The facade must hold the screws permanently. With plastic or composite facades we cannot judge this from a distance. On insulated facades, standard wall plugs only grip in the insulation, so you need special ETICS wall plugs that pass the load into the masonry.

Pergola or steel frame without a fascia board

The outer cables are fixed with brackets at the side of the outer beams, the middle ones under the cross beam on the garden side and to the face of the wall on the house side. With steel beams you can also screw the tensioner straight through the web, and on metal profiles the stainless steel tensioner sits directly on the profile.

Unsure about the fixing or renting

If you cannot say for certain whether the structure will hold, we first make a single panel for testing. If it holds, the rest follow. If you rent, get the landlord's written consent before drilling. Questions about the structure under a balcony are answered in Awning on a balcony with ceiling mounting.

Contents, Tools and PDF

Installation Guide as PDF and What Is in the Box

Cable awning contents: polyester cable, sliders and stopper for one panel

We send the installation guide for your awning digitally as a PDF with the order confirmation or the invoice. We deliberately do not include a printed copy in the parcel: we work with recycled cartons, paper packing tape and no printed instructions. If you have lost the file, we are happy to send it again. You will also find the installation guide for the cable awning with all the steps and pictures on this page. The guide for the made-to-measure folding awning also comes digitally. The awning fabric arrives made up, with the aluminium tubes in sewn-in fabric pockets.

  • In the box: tensioners for your installation variant, sliders, polyester cable as tension cable (2.2 mm, 1,800 N tensile load), stoppers, operating pole (80 cm) and a GERMES tool set.
  • You do not need runner hooks for the cable awning: the panel runs on plastic sliders directly on the cable.
  • We supply stainless steel cable only by arrangement, for example from a length of around 6.5 m.
  • Length: you state the length including the cable tension system. We cut the tension cables to match, with a reserve for clamping and tensioning.
  • Have ready yourself: a drill and a screwdriver or cordless screwdriver. Pliers and a few cable ties are useful.
  • Single stoppers are available as spare parts. If you later want a whole new fabric, read Re-covering an awning.
Variant 1

Fixing to the Fascia Board

This is how you can install the cable awning if your roof has a fascia board at the front and back, meaning a cross beam across the front, or the house wall at the back. For each panel you need at least two tensioner sets, one per side.

Cable awning fixed to the fascia board: screw hooks, cable clamps and tensioner
Parts for Variant 1

The Parts You Need per Panel

In addition to the cable, sliders and stoppers in the box:

  • 4 screw hooks, 2 at the front and 2 at the back in the fascia board
  • 2 standard tensioners with screw hook and eyelet, turning them tensions the cable
  • 4 cable clamps, 2 per cable, they clamp the cable loops
Screw hooks screwed into the fascia board in pairs at the same spacing
Step 1

Screw the Hooks into the Fascia Board

Screw 2 screw hooks into the fascia board at the front and at the back. The pairs of hooks sit at the same spacing on both sides, so the cables later run parallel. You hang one slider on each of the rear screw hooks straight away.

Cable loop with cable clamp on the screw hook in the fascia board
Step 2

Attach the Fixed Cable End

Make a loop at the end of the cable, clamp it with a cable clamp and hang it in the front screw hook. This is the fixed end of the cable.

Tensioner with eyelet and cable clamp hung on the screw hook
Step 3

Connect the Tensioner

Turn the tensioner right open, so the full tensioning travel stays in reserve. Lay the other end of the cable as a loop around its eyelet, line it up together with the cable clamp and only then cut the cable. Hang the screw hook of the tensioner in the rear screw hook.

Tensioning the cable taut by turning the tensioner
Step 4

Tension the Cable

Turn the tensioner closed until the cable sits straight and taut. Do not overtension it, or you put unnecessary load on the fixing points.

Two parallel tensioned cables between the rafters seen from below
Step 5

Same on the Other Side

Repeat steps 1 to 4 on the other side and at every further cable guide. Check that all the cables run parallel.

Cable awning: aluminium tube of the panel clipped into the slider on the cable
Step 6

Pull On the Sliders and Hang the Panel

Pull the sliders onto the cables. Put the last slider directly on the screw hook on the tensioner side, which fixes the last aluminium tube of the panel. Then clip the aluminium tubes of the panel into the sliders and stopper. The tubes deliberately go in firmly, tips for this follow further down.

Variant 2

Angle Tensioners between the Rafters

This variant suits you if there is no fascia board and you fix to the side of timber or metal rafters. Galvanised iron brackets at both ends of the rafters take the screw hooks. For each panel you need two tensioner sets.

Iron brackets, screw hooks and nuts for angle mounting of the cable awning
Parts for Variant 2

The Parts You Need per Panel

In addition to the cable, sliders and stoppers in the box:

  • 4 iron brackets, galvanised, 2 at the front and 2 at the back
  • 2 short screw hooks for the front brackets, 2 long ones for the rear
  • 8 contact washers M5 and 8 hex nuts M5
  • Wood screws 5 x 30 mm for timber rafters or self-tapping screws M5 x 16 mm for aluminium or metal rafters
  • 2 tensioners with screw hook and eyelet, 4 cable clamps
Iron bracket fixed to the side of the rafter with two screws
Step 1

Screw the Iron Brackets to the Rafters

Fix one iron bracket at the front and one at the back to the side of the rafter. In timber use the wood screws. In aluminium or metal, pre-drill with 4.5 mm and fit the self-tapping screws, as without pre-drilling the material splits.

Short screw hook with contact washer and nut on the front iron bracket
Step 2

Short Screw Hooks at the Front

Fit the short screw hooks with contact washer and hex nut to the front brackets. The contact washers stop the nuts from working loose.

Long screw hook on the rear bracket with slider slid on
Step 3

Long Screw Hooks at the Back, Slide On the Sliders

Fit the long screw hooks to the rear brackets and slide one slider onto each threaded rod straight away. It then already sits in the right place for the panel.

Cable loop with cable clamp on the front eyelet
Step 4

Attach the Fixed Cable End

Make a loop at the end of the cable, clamp it with a cable clamp and hang it in the front eyelet.

Tensioner on the rear screw hook, turning it tensions the cable
Step 5

Hang the Tensioner and Tension

Turn the tensioner right open, lay the other end of the cable around its eyelet, line it up together with the cable clamp and only then cut. Hang the tensioner on the rear screw hook and turn it closed until the cable sits taut.

Brackets fitted on both sides, the cables run parallel
Step 6

Same on the Other Side

Repeat steps 1 to 5 on the opposite rafter and check that both cables run parallel.

Fabric panel with aluminium tubes in sliders between two rafters
Step 7

Pull On the Sliders and Hang the Panel

Pull the remaining sliders onto both cables, fix the stopper on the last aluminium tube and clip the aluminium tubes of the panel into the sliders and stopper.

Variant 3

Stainless Steel Tensioners between or under the Rafters

The stainless steel tensioner is compact and sits at the side of the rafter (between the rafters) or on its underside (under the rafters). When fitting from below, we recommend 3 cm clearance to the roof. For each panel you need two sets, one per side.

Parts of the stainless steel tensioner: bracket, countersunk screw, threaded sleeve, stop element and tensioning element
Parts for Variant 3

The Parts in One Set

A stainless steel tensioner set consists of:

  • 1 stainless steel mounting bracket with 2 wood screws
  • 1 countersunk screw with spring washer
  • 1 threaded sleeve, screwed onto the countersunk screw
  • 1 stop element that the cable runs through, with 2 grub screws, pre-fitted at the side at the factory
  • 1 tensioning element, screwed onto the threaded sleeve
Stainless steel mounting bracket fixed to the rafter with two screws
Step 1

Fit the Mounting Bracket

Choose the position at the side or underneath the rafter and screw the bracket on with 2 wood screws. In aluminium or metal, pre-drill with 4.5 mm. A facade plate is also possible instead of the bracket.

Spring washer, countersunk screw and threaded sleeve on the mounting bracket
Step 2

Fit the Countersunk Screw and Threaded Sleeve

Put the spring washer on the countersunk screw, pass the screw through the hole in the bracket and screw on the threaded sleeve.

Polyester cable clamped in the stop element with grub screws
Step 3

Clamp the Cable in the Stop Element

Pass the cable through the stop element and tighten both grub screws. They are offset so the cable also holds securely under load. On the opposite side, line up the cable first before you cut it.

Tensioning element screwed onto the threaded sleeve, the cable is tensioned
Step 4

Screw On the Tensioning Element

Screw the tensioning element onto the threaded sleeve so that it encloses the stop element. This is how you tension the cable. Use the thread fully on both sides, then you keep a reserve for re-tensioning.

Stainless steel tensioners on both sides, the cables run parallel
Step 5

Same on the Other Side

Repeat steps 1 to 4 on the opposite rafter and check that the cables run parallel.

Stainless steel tensioner on the rafter with the panel hung
Step 6

Pull On the Sliders and Hang the Panel

Pull the sliders onto both cables, fix the stopper on the last aluminium tube and clip the aluminium tubes of the panel into the sliders and stopper.

Installation Tips and Typical Mistakes

Panel Fitted before the Cables
If the panel is already hanging, the cables can hardly be pulled taut any more and the panel sags. Set and tension all the cables first, then the panel goes on.
Cable Guide Left Out
If a cable guide is missing, the panel sags in the middle. Use all of those that belong to your panel width. If that is not enough, we supply stainless steel cable, which can be tensioned tighter.
Cable Cut Too Early
If you cut before lining up, you have no tensioning reserve left. Turn the tensioner right out, clamp one side, line up the other side together with the cable clamp, then cut.
Sliders Are Hard to Push onto the Tube
That is intended, so nothing falls out. Rub the spot with a little soap and start with the angled corner. Or put the sliders and stopper into freshly boiled water for 5 minutes, which softens the plastic. With olefin, a denser fabric, clipping on is a little more awkward.
Panel Slides Back on Its Own
First check that the stoppers on the aluminium tube sit in the fabric fold. If that does not help, tighten a cable tie lightly on the last pair of sliders on the moving side. The slider must still stay movable, and you cannot see the cable tie from below.
Cables Do Not Run Parallel
If the cables run at an angle to each other, the sliders jam or the panel runs crooked. Measure the hook spacing on one side and transfer it exactly to the other.
After Installation
An awning is not a storm or rain roof. In rain, strong wind and storms, retract the panel and park the fabric stack under the roof. If the fabric stays damp there for long, mildew spots can form. What helps is explained in Removing mildew spots from an awning. For normal care, read Cleaning an awning.
Slope, Height, Look

Slope: Across, Lengthways and the Cloud Strap

Two measurements are often confused: the cross slope of the surface in degrees and the roof slope in percent, which decides the look of the panel. Each has its own rules.

Cross Slope in Degrees

If the surface falls to the side, across the running direction of the panels, up to about 30 degrees is not critical. Between 30 and 45 degrees we check each case individually, usually with firm tension and stainless steel cable. We cannot promise reliable function then. From about 45 degrees we recommend a firmly tensioned made-to-measure sun sail.

Lengthways Slope with the Cord Pull System

If the panels run up the slope, for example on a glass roof between the rafters, gravity does not pull the panel sideways. The bunched-up stack is the difficult part, as it wants to slide down. The cord pull system helps here: an endless operating cord runs over pulleys above the panel. You move the panel from the ground and hold it in any position.

Stack at the Highest Point

On any installation with a slope, the fabric stack parks at the top. A stopper on the first aluminium tube holds it there. Parking at the low end is not provided for in the design.

Cloud Strap for Roof Slope

With the cloud look, the panel is about 5-7% longer than the tensioned span, so the fabric hangs between the cross tubes. On a slope the tubes slide downwards: the panel becomes tight at the top and sags deeply at the bottom. The cloud strap, two straps per panel sewn at the sides to every fabric pocket, keeps the tubes at an even spacing. The extra length stays the same. From about 7-8% roof slope, choose the cloud look only with a cloud strap, otherwise the taut look. In a windy spot the strap also helps without a slope.

Fitting Height over 3 m

You can reach the panel by hand up to about 2 m, and with the operating pole up to about 3 m. If the awning sits higher, for example under a conservatory roof, you operate it from the ground with the cord pull system. There is no motor for the cable awning, it is operated by hand.

Frequently Asked Questions

Frequently Asked Questions

First you set the fixing, depending on the structure screw hooks on the fascia board, iron brackets or stainless steel tensioners on the rafters. Then you attach all the cables and tension them firmly. Only after that do you pull on the sliders and clip the aluminium tubes of the panel into the sliders and stopper.

With the cable awning, yes, within limits. Across the running direction, a slope up to about 30 degrees is not critical, we check 30 to 45 degrees individually, and from about 45 degrees we recommend a firmly tensioned sun sail. If the panels run up the slope, that is feasible: the cord pull system holds the stack at the top, and you park at the highest point. With the cloud look, from about 7-8% roof slope the panel needs the cloud strap.

With the cable awning you pay nothing extra for the fixing parts: tensioners, sliders, polyester cable, stoppers, operating pole and a tool set come with every order. You can install it yourself with a drill and a screwdriver. Only stainless steel cable, which we supply by arrangement, costs extra. If you hire a tradesman, his effort depends on the number of panels and holes, between the rafters about 8 per bay, under the rafters about 4. For commercial building projects our own fitters install on request.

Yes. We send the installation guide digitally as a PDF with the order confirmation or the invoice. A printed copy is not included in the parcel. If you no longer have the file, we will send it again.

Yes. The system comes with all the fixing parts, and you need a drill and a screwdriver or cordless screwdriver. The order matters: first set and tension all the cables, then hang the panel.

Turn the tensioner right out so the full tensioning travel stays in reserve. Clamp the cable on one side, line it up on the other side together with the cable clamp at the tensioner and only then cut it. Then tension until the cable sits straight and taut.

Stoppers fix the panel on the cable and set the parked and extended positions. If the panel slips, first check that the stoppers on the aluminium tube sit in the fabric fold. To stop it slipping back by itself, tighten a cable tie lightly on the last pair of sliders.

Yes, with 4.5 mm. Without pre-drilling the material splits when the self-tapping screws M5 x 16 mm are driven in. In timber rafters the wood screws are enough without pre-drilling.

No. The aluminium tube with its plastic caps is 10 mm shorter than the clear width, which leaves 5 mm of air on each side. If the sliders sit correctly, the panel does not touch the rafters, and if it does touch once, the caps protect against scratches.

No, it is operated by hand, without a motor and without a power connection. Up to about 3 m height the supplied operating pole is enough, above that you operate the panel from the ground with the cord pull system.

Sources

Last reviewed: 23.10.2026 · Reviewer: Germes-Team

Questions about installing your awning?

Send us a photo of your rafters and the spacings. We will tell you which fixing suits and which fixing kit you need.


Please sign in to write a comment.